From feasibility to handover, an architect’s work is usually described in stages. Here is what each stage involves and what you should expect to receive.

When you appoint an architect, it helps to know what you are paying for. In the UK, the work is usually described using the RIBA Plan of Work, which divides a project into eight stages. Not every project needs every stage, and many clients appoint an architect for only some of them.
The project is defined: what you want to achieve, the budget, the programme and what the site or building allows. This often includes a measured survey, a review of planning history and constraints, and a feasibility study testing a few options.
Layouts, massing and the overall design approach are developed and tested against the brief and budget. For planning-led projects, this is where the design is shaped around planning policy.
The design is developed and coordinated with structural and services engineers and other consultants. This is usually the stage at which a planning application is submitted.
This is the detailed package that allows the building to be priced and built: construction drawings, details, specifications and schedules, together with the information for building regulations approval. For commercial premises it often includes the information a landlord needs for approval.
The architect may answer questions from site, review the contractor’s drawings, inspect the work and administer the building contract. Under a design and build appointment, the same team carries the project through construction.
Snagging, certificates, manuals and the end of the defects period.
A clear scope at the start avoids misunderstandings later. Read more about our architectural design services and how a project runs.